BUILDING PERMIT FEE SCHEDULE |
|
RESIDENTIAL |
|
|
BUILDING (NEW & ADDITIONS) ELECTRICAL |
$.13 PER SQ FT. EACH FLOOR $.08 PER SQ FT. EACH FLOOR |
|
PLUMBING |
$.08 PER SQ FT. EACH FLOOR |
|
MECHANICAL |
$.08 PER SQ FT. EACH FLOOR |
|
ACCESSORY BUILDINGS, DECKS, PORCHES, UTILITY BIDG. ETC |
|
|
BUILDING |
$45.00 |
|
ELECTRICAL |
$45.00 |
|
PLUMBING |
$45.00 |
|
MECHANICAL |
$45.00 |
|
|
|
No charge for accessory buildings=< 12 feet maximum in any dimension.
All Buildings must meet zoning requirements and wind zone tie down requirements.
Homeowner Recovery Fund (NC GS 87-15-15.9) this fee is charged for every residential permit issued to a Licensed General Contractor for Construction or Alteration of a single-family dwelling, duplex or condominiums. $10.00
Repairs and renovations per system $.03 PER SQ FT PLUS $45.00
No permit is required for minor non-structural repairs costing <$5,000. or minor Mechanical, Electrical or Plumbing repairs.
Manufactured homes (mobile homes) and Modular Homes. This permit covers foundation, wind load, tie down and utilities inspections
|
SINGLE WIDE MOBILE HOME |
$100.00 |
|
DOUBLE WIDE MOBILE HOME |
$150.00 |
|
ADDITIONAL UNITS |
$ 50.00 |
|
MODULAR HOMES |
$200.00 |
|
HOUSE MOVING (INSTALLING) |
$200.00 |
|
HOUSE OR MOBILE HOME DEMOLITION |
NO CHARGE |
|
REPAIRS OF ELEC., PLUMBING ETC |
$ 45.00 |
|
REINSPECTION FEE |
$ 25.00 |
|
MINIMUM RESIDENTIAL PERMIT |
$ 45.00 |
|
BUILDING |
$.25 PER SQ FT FOR 1ST 1,000 SQ FT $.15 PER SQ FT FOR ALL OVER 1,000 SQ. FT |
|
ELECTRICAL |
$.09 PER SQ FT FOR 1ST 1,000 SQ FT $.05 PER SQ FT FOR ALL OVER 1,000 SQ. FT |
|
PLUMBING |
$.09 PER SQ FT FOR 1ST 1,000 SQ FT $.05 PER SQ FT FOR ALL OVER 1,000 SQ. FT |
|
MECHANICAL (HVAC) |
$.09 PER SQ FT FOR 1ST 1,000 SQ FT $.05 PER SQ FT FOR ALL OVER 1,000 SQ. FT |
|
Renovations/ repair/ remodeling |
$45.00 plus $8.00/ $1,000 contract |
|
Change out of system |
$45.00 |
|
Refrigeration system |
$45.00 |
|
Minimum Fee per system (Fire alarm, Hood, Fire suppression and the like) |
$45.00 |
|
Signs |
$ 1.50 per sq ft |
|
Yard Sprinkler |
$50.00/ system |
|
Building Fire Sprinkler System |
$300.00 per system plus $2.00 per head |
|
Curb Cut Permit |
$ 45.00 |
|
Electrical Load Management |
$ 15.00 |
|
Zoning Permit |
$ 15.00 |
|
Street name change, Application Fee |
$100.00 |
|
Fire Inspection required by Fire Code and Ordinance Schedule |
No Charge |
|
Fire Inspections by owner/operator request |
$ 40.00 |
|
Fire/ Building Insp for day care, home care |
$ 40.00 |
|
|
|
|
BOOKS AND ORDINANCES ETS. |
|
|
Copy of Zoning Ordinance |
$ 20.00 |
|
Copy of Subdivision Ordinance |
$ 20.00 |
|
Copy of Building Code |
$ Cost plus shipping and handling |
|
Handicap Signs |
$ Cost plus shipping and handling |
|
Copy of Flood or Minimum Housing Ordinance |
$ 20.00 |
|
Copy of Water/ Sewer Ordinance |
$ 20.00 |
|
3.5 floppy or CD of above Ordinances |
$ 5.00 |
|
Copies to local governments |
NO CHARGE |
|
Re zoning |
$200.00 |
|
Advertising charge |
$ Actual cost |
|
|
|
|
Zoning Amendment |
$200.00 |
|
Advertising charge |
$ Actual cost |
LAND DEVELOPMENT ZONING AND PLANNING Continued
|
Special Use/ Conditional Use Permit |
$200.00 |
|
Advertising charge |
$ Actual costs |
|
|
|
|
Variance Request |
$200.00 |
|
Advertising charge |
$ Actual costs |
|
|
|
|
Appeal |
$100.00 |
|
Advertising Charge |
$ Actual costs |
|
|
|
|
Annexation Requests |
$300.00 |
|
|
|
|
Street/ Alley Closing |
$150.00 |
|
Advertising charge |
$ Actual costs |
Should a decision of the board be delayed because of an incomplete application or inadequate information provided to the board, a fee equal to the board members perdiem and advertising costs will be charged the applicant and be paid prior to the hearing on the matter.
Subdivision fees are for administrative cost and inspections of infrastructure, roads, landscaping, monuments, sewer and water distribution lines, etc.
All subdivision plans may be reviewed by the Town Engineer for compliance with town specifications and accuracy of water, sewer and drainage utilities. The actual cost of review is charged to the developer. Minimum cost is ..........$500.00
|
Sketch Plan |
No Costs |
|
Minor Subdivision (Staff review & Approval) |
$5.00 per lot |
|
Minor Subdivision, Board Approval |
$150.00 |
|
Major Subdivision, Board Approval |
$400.00 |
|
Planned Unit, Conditional Use Development |
Initial Application $ 400.00 |
|
Modifications, amendments, additions To a Subdivision of PUD/CUD |
$150.00 |
|
Sketch Plan |
No Cost |
|
Minor Subdivision (Staff Review) |
$5.00 per lot |
|
Minor Subdivision, Board Approval |
$150.00 |
Subdivision Plat Review, Commercial/Industrial Continued
|
Major Subdivision, Board Approved |
$400.00 |
|
Planned unit, Conditional Unit Development |
$400.00 |
|
Modifications, additions to Subdivision or PUD/CUD amendments, |
$150.00 |
Manufactured (Mobile Home) and Recreation Park
The park fees are for administration costs and inspections of infrastructure, roads, landscaping, electrical pedestals, etc.
|
Manufactured (Mobile home parks < 30 acres) |
$250.00 |
|
Over 30 Acres |
$400.00 |
|
Expansions, Same as new |
|
|
Central Water Systems |
$150.00 |
|
Central Sewer Systems |
$150.00 |
Any and all buildings subject to the building code are charged a Commercial building permit fee.
|
Recreation Vehicle Parks (Campground)<30 ac |
$200.00 |
|
Over 30 Acres |
$400.00 |
|
Expansions, same as new |
|
|
Central Water System |
$150.00 |
|
Central Sewer System |
$150.00 |
Any and all buildings subject to the building code are charged a commercial building permit fee.
Effective Date September 4, 2001